TITAN FLOW CONTROL CATALOG - 0724
BS87AB-0722
SIMPLEX BASKET STRAINER f THREADED ENDS (FF) ASME CLASS 150 f ALUMINUM BRONZE - LEAD FREE*
TITAN
TITAN FLOW CONTROL, INC.
e n t s !
r e q u i r e m
M e e t s L E A D - F R E E ( 1 )
MODELS: BS 87-AB
( alum i num bronze )
F FEATURES
S IZES : 3 / 4 " ~ 3 "
Q ui ck -O pen C over A va i lable
s BETTER FLOW CHARACTERISTICS wi th i t s dual annulus de s i gn , the BS87 s e r i e s p rov i de s a s tra i ght e r f low path . dur i ng f low s i mulat i on t e s t i ng , the B S 87 ach i e v ed a 10 p e rcent r educt i on i n p r e s sur e los s when compar ed to " ov e r - the - top " s ty l e b a s ke t s tra i ne r s . s FINER FILTRATIONS the BS87 s e r i e s i s de s i gned wi th a mach i ned , f lat s eat for the s tra i n i ng e l ement . th i s al lows an op t i onal o - r i ng to b e i ns tal l ed unde rneath the l i p of the s tra i n i ng e l ement , cr eat i ng a t i ght s eal . th i s f eatur e p r e v ent s de br i s f rom s l i p p i ng pa s t the s tra i n i ng e l ement l i p - a s i s of t en the ca s e wi th ' s lant - ty p e ' b a s ke t s tra i ne r s that cannot ut i l i ze an o - r i ng . s large stra ining capac i ty wi th i t s large body and s i zeab l e s tra i n i ng e l ement , the b s 87 AB ha s the ab i l i ty to s tor e large quant i t i e s of de br i s wi thout a f f ect i ng p r e s sur e los s - thus max i m i z i ng t i me b e twe en s e rv i c i ng . s numerous stra ining element opt ions s tra i n i ng e l ement s ar e ava i lab l e i n a var i e ty of p e r forat i ons , me she s , and mat e r i al s . s p ec i al de s i gns ar e al so ava i lab l e i nclud i ng magne t i c , wedgewi r e , dr i l l ed p e r forat i ons , and p l eat ed s tra i n i ng e l ement s . s astm b148 body mater i al alum i num bronze i s s tronge r and l e s s l i ke ly to corrode than othe r bronze alloys , mak ing i t a preferred choi ce for s ea water and other appl i cat ions whe r e corros i on i s a conce rn . b ecaus e of i t s cop p e r cont ent , mar i ne organ i sms cannot colon i ze on the mat e r i al . add i t i onal ly , t i tan ’ s b s 87 - ab i s us ed for potab l e wat e r ap p l i cat i ons a s i t me e t s l ead f r e e s tatut e s r equ i r i ng that the l ead content i n the wetted sur face s i s 0 . 25% or l e s s as determ i ned by a we i ght ed av e rage .
T TECHNICAL
PRESSURE/ TEMPERATURE RATING (2) AB - ASTM B148 - CLASS 150
WOG (Non-shock) : 225 PSI @ 150 °F
1. The BS 87-AB meets requirements for lead free use in potable water systems. The lead content in the wetted surfaces is 0.25% or less as determined by a weighted average. For more information on lead free requirements, contact Titan Flow Control. 2. The above listed temperatures are theoretical and may vary during actual operating conditions. These ratings are based on ASME B16.24 for ASTM B62. The body material of the BS 87 is Aluminum Bronze B148 which may slightly exceed these ratings.
markets : potab l e wat e r , wat e r & wa s t ewat e r , pul p & pap e r , chem i cal & p e trochem i cal , p e trol eum , o i l & ga s , trans portat i on , gov e rnment , mar i ne i ndus try ( s eawat e r ) , and food i ndus try general appl i cat ion : s i mp l ex b a s ke t s tra i ne r s ar e i ns tal l ed i nto a p i p e l i ne s ys t em to r emov e unwant ed de br i s f rom the p i p e l i ne f low . b a s ke t s tra i ne r s ar e commonly us ed i n hor i zontal p i p e l i ne s whe r e de br i s load i ng i s h i gh and the col l ect i on of sol i ds i s r equ i r ed . s tra i n i ng i s accomp l i shed v i a a p e r forat ed or me sh l i ned s tra i n i ng e l ement , i nt e rnal to the b a s ke t s tra i ne r . i n gene ral , the s i ze of the p e r forat i on or me sh should b e s l i ght ly smal l e r than the smal l e s t de br i s part i cl e to b e r emov ed . i t i s i mportant to not e that the corr ect s i ze of a b a s ke t s tra i ne r i s de t e rm i ned by i t s j ob funct i on , not by the s i ze of the p i p e l i ne .
A
The above da t a repre s en t s common ma r ke t and s e r v i ce app l i ca t i ons . No repre s en t a t i on o r gua ran t ee , expre s s ed o r imp l i ed , i s g i ven due t o t he nume rous va r i a t i ons o f concen t ra t i ons , t empe ra t u re s and f l ow cond i t i ons t ha t may oc cu r du r i ng ac t ua l s e r v i ce .
APPLICATIONS
Tel: 910-735-0000 s Fax: 910-738-3848 s titan@titanfci.com s www.titanfci.com 290 Corporate Drive s PO Box 7408 s Lumberton, NC 28358 YOUR PIPELINE TO THE FUTURE! TITAN ® FLOW CONTROL, INC.
Made with FlippingBook - Online catalogs